Step 3 cut the timber to the desired size and screw into place.
Repalcing wod beams in attic.
Using a pry bar gently pry the beam loose from the ceiling.
Repeat the process for the joist beneath your old roof rafter.
Cut the beam out of its resting place using a reciprocating saw.
Attach the trim piece to wrap the beam image 3.
Expose at least two trusses so that you can nail the replacement wood to them to make the replacement section stable.
Step 2 determine the extent and area that you intend to repair or replace.
If only part of the joist is damaged measure the space where the rotten wood has been removed.
If the existing joist system is very close to being sufficient to support a new attic flooring the addition of bridging between the joists may be all that s required.
Use your tape measure to record the distance of both rafter legs.
If you are replacing the entire joist you may screw the wood into the opposing top and bottom joists.
Use a circular saw to cut two sets of new rafters from the same size wood by the same dimensions.
Cut away the damaged area.
Measure the length of wood required for the space.
Prime spots in the attic for wood rot are on the underside of the roof decking in the joints where the wood members connect at the peak of the roof and at the edges of the attic where the.
Pry out nails with a claw hammer or pry bar and remove the cut piece.
Cut the wood you ll use to wrap the new beam.
The 2012 irc code calls for a minimum of a 32 o c.
The beam system we show will work for nearly any opening up to 12 ft.
Measure the dimensions of the old rafters beneath your roofing surface.
Fastening beams of more than one ply must be fastened together with either nails or bolts.
But your beam could be made from other materials ranging from simple doubled 2x12s for shorter spans to more exotic beams consisting of glued and compressed stranded wood fibers or laminated 2x4s.
We have learned from our experience to use at least a 3 1 4 x 131 groove shank nail in a column of four every foot apart down the laminate.
Nail a fill strip at the top and bottom of the beam which will bring the trim board to the desired width image 2.
Make a cut in the center of the beam while a helper holds the two pieces into place.
Replacing a wood beam with steel the lvl beam had been installed in an earlier remodel to replace structural partitions supporting the second floor.
Since cox knew that a flush steel beam could do the job just as well but invisibly he offered to include the swap out in the contract.
Cut a 45 degree angle so the edges will be properly mitered for a clean look.
Cut through any nails at the points where the beam is attached to the surrounding framing.